Cinema approval
Cinema approval authorises the operation of a screening establishment, after verification of its equipment, its safety and its ability to programme approved films.

Opening or taking over a cinema requires approval from the Ministry of Arts and Culture. It validates the quality of the screening, the safety of the public, the conformity of the equipment and the operator’s commitment to programme only films holding a visa. It distinguishes a permanent cinema from a simple occasional screening venue. For distributors, it is also a guarantee of working with a registered operator who is required to report admissions and takings.
- Fee payable
- 150,000 FCFA
- Turnaround
- The usual time is twenty to thirty-five working days
- Validity
- Valid for 5 years, renewable on request before expiry
- Documents to provide
- 7
Who is this procedure for?
The application comes from the operator of the cinema, whether owner of the business or tenant. It applies to traditional cinemas, local digital cinemas, multi-screen complexes and itinerant venues permanently installed. Companies must be duly registered and their manager may be interviewed.
Processing time. The usual time is twenty to thirty-five working days. An inspection postponed at the operator’s request, or corrections required to the equipment, may extend it.
Before you begin
- The operator must declare a cinema equipped with a working digital or film projector and a sound system suited to the size of the venue.
- The premises must offer safeguards against fire, with emergency exits, emergency lighting and regularly inspected fire extinguishers.
- The operator undertakes to keep a register of screenings and admissions, available to Ministry officials.
- The manager must not have been subject to any conviction incompatible with operating an establishment open to the public.
Documents to provide
- Application for approval specifying the name, address and number of auditoriums or screens
- Trade register entry and tax registration certificate of the operator
- Lease, title deed or occupancy agreement for the premises
- Plans of the venue showing seats, exits and the projection booth
- Description and invoices for the projection and sound equipment
- Certificate of electrical conformity and fire extinguisher inspection
- Criminal record extract of the manager
Step by step
- File submissionThe file is submitted to the One-Stop Shop and then forwarded to the Cinema and Audiovisual Service, which checks that it is complete.
- Study of the equipmentThe service examines the description of the projection and sound equipment and may request a technical demonstration.
- Inspection of the venueAn inspector visits the venue, checks the booth, the condition of the seats and the exits, and draws up a visit report.
- Payment of the feeThe fee payable is displayed before payment. It is due after the favourable opinion and before the approval is drawn up.
- Issue of the licenceThe approval is handed to the operator together with the obligations to report screenings periodically. It must be displayed in the foyer.
Special cases
A small venue equipped with a professional video projector may be approved if the picture and sound quality are sufficient. The operator declares its actual capacity and its price list.
Each screen is checked, but a single file is sufficient. The capacity of each auditorium is stated separately in the approval.
A cinema that has been closed for a long time must undergo a full inspection as for a new establishment. Refurbishment works must be completed before issue.
Frequently asked questions
May I screen films before approval?
No. Until approval is issued, the cinema may not programme paid public screenings. A one-off screening authorisation remains possible for a specific event, but does not replace the permanent approval.
Is approval required for each new screen?
Yes, adding a screen changes the capacity and the safety conditions, so an amendment application must be submitted. It leads to a visit limited to the new space.
Which films am I allowed to programme?
Only films holding an exploitation visa, the number of which you must keep. The age classification attached to the visa must be displayed at the entrance and enforced at the box office.
How do I renew my approval?
Submit a renewal application three months before expiry, together with the summary of your screenings for the period. A new visit is organised only if the cinema or its equipment has changed.
Useful templates and documents
- Exploitation licence agreementContract
- Display authorisationCertificate
- Storage safety sheetProfile
- Takings statementInvoice
Reference texts
- Texts in force relating to the operation of cinemasText
- Decree on the organisation of the Ministry of Arts and CultureDecree
Services that process the file
- Service of Cinema and Audiovisual
- Directorate of General Affairs
Conseil. Conservez vos billets d’entrée et votre registre des séances dès la première semaine : c’est ce registre qui sera examiné lors du renouvellement et en cas de contrôle.
Submit the file
Fee payable: 150,000 FCFA
Have an account? Sign in to pre-fill the form and attach your documents.