Performance venue approval
Approval officially recognises that a venue meets the safety, capacity and equipment requirements for hosting live performances open to the public.

A theatre, multipurpose hall, cabaret or cultural centre that regularly receives the public must be approved by the Ministry of Arts and Culture. The approval certifies that the venue complies with standards for safety, evacuation, acoustics and reception of people. It reassures the companies that perform there, makes it easier to obtain performance authorisations and protects the operator in the event of an inspection. It is obtained after a technical visit to the venue by the competent services.
- Fee payable
- 100,000 FCFA
- Turnaround
- Allow twenty to thirty working days, technical visit included
- Validity
- Valid for 3 years, renewable after inspection
- Documents to provide
- 8
Who is this procedure for?
Approval is requested by the owner or operator of the venue: an individual, company, association or local authority. It applies to any live performance venue (theatre, concert, dance, comedy), whether existing, renovated or newly opened, whatever its size. The manager must be able to prove their right to occupy the premises.
Processing time. Allow twenty to thirty working days, technical visit included. Compliance works requested by the commission may significantly extend the procedure.
Before you begin
- The venue must have emergency exits that are signposted, unobstructed and sufficient in number for its maximum capacity.
- The electrical installation and fire-fighting equipment must have been checked and comply with the standards in force.
- The applicant must prove a right to occupy the premises: ownership, lease or operating agreement of sufficient duration.
- The venue must provide toilets, access suitable for people with reduced mobility and a stage area of at least a minimum size set by the Performances Service.
Documents to provide
- Application for approval addressed to the Minister, stating the name and address of the venue
- Title deed, lease or operating agreement for the premises
- Dimensioned plans of the venue, showing the location of exits and toilets
- Certificate of conformity of the electrical installation issued by a professional
- Certificate of inspection of the fire extinguishers and alarm system
- Trade register entry or articles of association of the operator
- Certificate of public liability insurance for the operation
- Recent photographs of the venue, the stage and the access points
Step by step
- Submission of the applicationThe complete file is submitted to the One-Stop Shop, which forwards it to the Performances Service to check its admissibility.
- Review of plans and documentsThe plans, technical certificates and insurance are checked. Additional documents may be requested in writing before any visit.
- Technical visit to the venueA commission visits the site to measure the capacity, test the exits and check the equipment. The operator is informed a few days beforehand.
- Payment of the feeThe fee payable is displayed before payment. It is required after the commission’s favourable opinion, at the One-Stop Shop or online.
- Issue of the licenceThe order or certificate of approval is handed to the operator. It states the maximum authorised capacity, which must be displayed at the entrance to the venue.
Special cases
A small community hall may obtain an approval with limited capacity if its exits and electrical installation comply. The authorised capacity is strictly indicated.
Any change to the structure or capacity requires a new visit. The previous approval remains valid until a decision is made on the amendment application.
When the venue is taken over by a new operator, the latter requests the transfer of the approval and attaches the deed of assignment. A visit is not automatic if the venue is unchanged.
Frequently asked questions
May I hold a performance before obtaining approval?
This is not advisable: an unapproved venue cannot habitually receive the public. A one-off performance may sometimes be covered by a temporary authorisation, granted after a review of the venue’s safety.
What exactly does the capacity cover?
The capacity includes all standing and seated spectators, as well as the artists and staff present in the venue. It is calculated from the usable area and the exits, and may never be exceeded, even on a night of heavy attendance.
Who pays for the works requested by the commission?
Compliance works are at the operator’s expense. The commission states precisely the points to be corrected and a reasonable deadline, after which a follow-up visit is organised before the final decision.
Can the approval be withdrawn?
Yes, in the event of a serious breach of safety rules, repeated exceeding of capacity or cessation of activity. The operator is heard before any decision and may submit observations in writing.
Useful templates and documents
- Exhibition insurance contractContract
- Display authorisationCertificate
- Storage safety sheetProfile
- Show technical sheetProfile
Reference texts
- Texts in force relating to establishments open to the public and to performancesText
- Decree on the organisation of the Ministry of Arts and CultureDecree
Services that process the file
- Service of Performances
- Directorate of General Affairs
- Regional Delegations
Conseil. Faites établir l’attestation électrique et la vérification des extincteurs avant le dépôt : ce sont les deux pièces techniques dont l’absence retarde le plus la fixation de la visite.
Submit the file
Fee payable: 100,000 FCFA
Have an account? Sign in to pre-fill the form and attach your documents.